photo courtesy Sungevity It’s only 10/6 and the first 10/10/10 Global Work Party event is already over, or will soon be: President Mohamed Nasheed of the Maldives’ new solar panels have been installed on the roof of the presidential residence. The 11.5 kW system was designed by S… Read the full story on TreeHugger
Originally posted here:
The Global Work Party Begins: Maldives President Finishes Solar Panel Installation